KCTT have been commissioned to assist Aurizon to develop additional areas for stock pilling of materials and equipment to facilitate improvements to their logistics operations at the Kwinana Beach Depot.

Our scope of works includes:

  • Stormwater drainage strategies over 13 separate undeveloped areas. 
  • Earthworks and infrastructure plans for potential redevelopment of each area.
  • Detailed stormwater drainage calculations for basin capacities. 
  • Calculation of all preexisting stormwater drainage catchments across 70 Ha site.
Engineer:
Colin Kleyweg
project type:
Civil Engineering
Duration:
1 Year and ongoing
client:
Aurizon
Designer:
Stefan Nedeljković, Marko Janković & Marko Šatev
Finish date:
April 2023